ITAC Assessment: LE0321
ITAC logo
ITAC Assessment: LE0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Jet Engine Blades/Vanes
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 70,230
ft2
Annual Production 86,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,606 2,590,000
kWh
Electricity Demand $46,930 7,329
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,801 $8,300 $8,265
100,799
kWh
$1,536
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,323 $1,360 $4,709
57,438
kWh
$614
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,529 $30 $3,909
47,673
kWh
$620
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $2,115 $800 $1,840
22,461
kWh
$275
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,996 $7,200 - - $1,996
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $1,196 $165 $1,001
12,212
kWh
$195
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $20,464 $60,000 $18,109
220,838
kWh
$2,355
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,803 $18,000 $3,366
41,040
kWh
$437
-
kW-mo/yr
-
TOTAL RECOMMENDED $49,227 $95,855 $41,199
502,461
kWh
$6,032
-
kW-mo/yr
$1,996
-
MMBtu
TOTAL IMPLEMENTED $24,652 $27,855 $21,250
259,162
kWh
$3,402
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs