| Assessment Year | 2011 |
|---|---|
| Principal Product | Jet Engine Blades/Vanes |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 14 |
| Plant Area |
70,230
ft2
|
| Annual Production | 86,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $211,606 | 2,590,000 |
kWh
|
$0.082 |
| Electricity Demand | $46,930 | 7,329 |
kW-mo/yr
|
$6.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,227 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,652 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,801 | $8,300 |
$8,265
100,799
kWh
|
$1,536
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,323 | $1,360 |
$4,709
57,438
kWh
|
$614
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,529 | $30 |
$3,909
47,673
kWh
|
$620
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,115 | $800 |
$1,840
22,461
kWh
|
$275
-
kW-mo/yr
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,996 | $7,200 | - | - |
$1,996
-
MMBtu
|
|
| 06 | 2.4322: Use or replace with energy efficient substitutes | $1,196 | $165 |
$1,001
12,212
kWh
|
$195
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,464 | $60,000 |
$18,109
220,838
kWh
|
$2,355
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,803 | $18,000 |
$3,366
41,040
kWh
|
$437
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $49,227 | $95,855 |
$41,199
502,461
kWh
|
$6,032
-
kW-mo/yr
|
$1,996
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,652 | $27,855 |
$21,250
259,162
kWh
|
$3,402
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs