ITAC Assessment: SU0591
ITAC logo
ITAC Assessment: SU0591
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Interior Lighting and Vents for Commercial and Business Jets
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 60,000
ft2
Annual Production 151,673
pieces
Production Hrs. Annual 2,125
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,892 606,400
kWh
Electricity Demand $45,528 3,184
kW-mo/yr
Electricity Fees $19,248 -
Natural Gas $30,144 2,241
MMBtu
Other Gas $3,220 1
MMBtu
TOTAL YEARLY COSTS $190,030
RECOMMENDED SAVINGS* $30,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $400 - $400
2,633
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $12,170 $91 - - - $12,170
03 2.4322: Use or replace with energy efficient substitutes $2,563 $80 $2,394
15,750
kWh
$1,072
-
kW-mo/yr
$(-903.4)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,169 $581 $797
5,242
kWh
$206
-
kW-mo/yr
- $166
05 2.6211: Conserve energy by efficient use of vending machines $699 $561 $699
4,598
kWh
- - -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $3,991 $8,000 $5,705
37,531
kWh
- $(-1,713.7)
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $963 $2,290 - - $963
-
MMBtu
-
08 2.7491: Insulate glazing, walls, ceilings, and roofs $480 $1,980 - - $480
-
MMBtu
-
09 2.5117: Convert to indirect temperature control system $8,490 $75,000 $2,823
18,573
kWh
$2,652
-
kW-mo/yr
$3,014
-
MMBtu
-
TOTAL RECOMMENDED $30,924 $88,583 $12,818
84,327
kWh
$3,931
-
kW-mo/yr
$1,840
-
MMBtu
$12,336
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs