ITAC Assessment: MA0226
ITAC logo
ITAC Assessment: MA0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product LITHOGRAPHIC PLATES
NAICS
n/a
SIC 2796: Platemaking and Related Services
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 43,700
thousand feet
Production Hrs. Annual 7,224
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,802 7,057,738
kWh
Natural Gas $81,399 10,136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $11,242 $21,238 - $11,242
-
MMBtu
02 2.7261: Install timers and/or thermostats $6,376 - $6,376
97,890
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,696 - $11,454
175,850
kWh
$(-5,758.0)
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $3,079 $9,000 $76
1,172
kWh
$3,003
-
MMBtu
05 2.2511: Insulate bare equipment $3,303 $856 $3,303
50,703
kWh
-
06 2.4133: Use most efficient type of electric motors $255 $3,020 $255
4,103
kWh
-
TOTAL RECOMMENDED $29,951 $34,114 $21,464
329,718
kWh
$8,487
-
MMBtu
TOTAL IMPLEMENTED $29,951 $34,114 $21,464
329,718
kWh
$8,487
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs