Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,226

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2505 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,294 $852
UC2505 #08 Y:2025 Apply for tax-free status for energy purchases $10,963 -
UC2505 #07 Y:2025 Use solar heat to make electricty $55,106 $495,624
UC2505 #06 Y:2025 Replace existing hvac unit with high efficiency model $16,679 $146,490
UC2505 #05 Y:2025 Install timers and/or thermostats $1,138 $1,140
UC2505 #04 Y:2025 Use cooling tower water instead of refrigeration $39,288 $50,000
UC2505 #03 Y:2025 Keep doors and windows shut when not on use $4,253 $2,096
UC2505 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $8,266 $75
UC2505 #01 Y:2025 Air condition only space necessary $2,475 $1,500
TT0328 #13 Y:2025 Turn off equipment during breaks, reduce operating time $306 $50
TT0328 #12 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,117 $1,990
TT0328 #11 Y:2025 Use insulation in furnaces to facilitate heating / cooling $1,157 $299
TT0328 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,292 $50
TT0328 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,237 $50
TT0328 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,275 $56,250
TT0328 #07 Y:2025 Use waste heat from hot flue gases to preheat $25,908 $60,000
TT0328 #06 Y:2025 Use solar heat to make electricty $41,721 $631,361
TT0328 #05 Y:2025 Replace city water with recycled water via cooling tower $52,760 $41,250
TT0328 #04 Y:2025 Optimize plant power factor $81,754 $144,000
TT0328 #03 Y:2025 Insulate bare equipment $92,553 $200,000