2,226
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2505 #09 Y:2025 | 09 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,294 | $852 |
n/a
|
UC2505 #08 Y:2025 | 08 | 2025 | Apply for tax-free status for energy purchases | $10,963 | - |
n/a
|
UC2505 #07 Y:2025 | 07 | 2025 | Use solar heat to make electricty | $55,106 | $495,624 |
n/a
|
UC2505 #06 Y:2025 | 06 | 2025 | Replace existing hvac unit with high efficiency model | $16,679 | $146,490 |
n/a
|
UC2505 #05 Y:2025 | 05 | 2025 | Install timers and/or thermostats | $1,138 | $1,140 |
n/a
|
UC2505 #04 Y:2025 | 04 | 2025 | Use cooling tower water instead of refrigeration | $39,288 | $50,000 |
n/a
|
UC2505 #03 Y:2025 | 03 | 2025 | Keep doors and windows shut when not on use | $4,253 | $2,096 |
n/a
|
UC2505 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $8,266 | $75 |
n/a
|
UC2505 #01 Y:2025 | 01 | 2025 | Air condition only space necessary | $2,475 | $1,500 |
n/a
|
TT0328 #13 Y:2025 | 13 | 2025 | Turn off equipment during breaks, reduce operating time | $306 | $50 |
n/a
|
TT0328 #12 Y:2025 | 12 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,117 | $1,990 |
n/a
|
TT0328 #11 Y:2025 | 11 | 2025 | Use insulation in furnaces to facilitate heating / cooling | $1,157 | $299 |
n/a
|
TT0328 #10 Y:2025 | 10 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,292 | $50 |
n/a
|
TT0328 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $5,237 | $50 |
n/a
|
TT0328 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $13,275 | $56,250 |
n/a
|
TT0328 #07 Y:2025 | 07 | 2025 | Use waste heat from hot flue gases to preheat | $25,908 | $60,000 |
n/a
|
TT0328 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $41,721 | $631,361 |
n/a
|
TT0328 #05 Y:2025 | 05 | 2025 | Replace city water with recycled water via cooling tower | $52,760 | $41,250 |
n/a
|
TT0328 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $81,754 | $144,000 |
n/a
|
TT0328 #03 Y:2025 | 03 | 2025 | Insulate bare equipment | $92,553 | $200,000 |
n/a
|