Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,260

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0261 #06 Y:2025 Use optimum size and capacity equipment $4,283 $1,200
DL0261 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $14,186 $16,400
DL0261 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $15,337 $90,000
DL0261 #03 Y:2025 Change procedures / equipment / operating conditions $9,021 $7,950
DL0261 #02 Y:2025 Utilize controls to operate equipment only when needed $4,374 -
DL0261 #01 Y:2025 Turn off equipment when not in use $5,489 $720
MS0452 #03 Y:2025 Condense operation into one building $26,400 $60,000
MS0452 #02 Y:2025 Use / purchase optimum sized compressor $2,035 $20,549
MS0452 #01 Y:2025 Change procedures / equipment / operating conditions $40,000 $43,390
NL0111 #06 Y:2025 Apply for tax-free status for energy purchases $471 $416
NL0111 #05 Y:2025 Meter waste water $564 $1,582
NL0111 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $739 $26
NL0111 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,349 $104
NL0111 #02 Y:2025 Install efficient rectifiers $9,429 $75,000
NL0111 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $19,532 $29,931
WM0246 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,267 $1,081
WM0246 #02 Y:2025 Recharge batteries on during off-peak demand periods $6,226 -
WM0246 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $12,702 -
TT0340 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $833 $700
TT0340 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,026 $16,500