ITAC Assessment: AM0947
ITAC logo
ITAC Assessment: AM0947
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electric Motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range less than $500
k
# of Employees 235
Plant Area 420,000
ft2
Annual Production 350
units
Production Hrs. Annual 2,084
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $813,428 14,281,034
kWh
Electricity Demand $271,226 62,182
kW-mo/yr
Electricity Fees $35,504 -
Natural Gas $51,498 7,621
MMBtu
Waste Disposal Costs
Water Usage $86,717 8,700
Tgal
TOTAL YEARLY COSTS $1,258,373
RECOMMENDED SAVINGS* $259,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $130,091 $15,000 - - $97,511 - $32,580
02 2.1233: Analyze flue gas for proper air/fuel ratio $12,879 $2,550 - - - $12,879
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $30,166 $1,100 $29,900
533,900
kWh
$266
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,720 $9,710 $4,720
84,200
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,140 $61,488 $3,075
54,918
kWh
$1,723
-
kW-mo/yr
- - $342
06 2.4234: Cool compressor air intake with heat exchanger $1,748 $2,063 $1,748
31,220
kWh
- - - -
07 2.9114: Use solar heat to make electricty $74,392 $829,317 $74,392
1,305,119
kWh
- - - -
TOTAL RECOMMENDED $259,136 $921,228 $113,835
2,009,357
kWh
$1,989
-
kW-mo/yr
$97,511 $12,879
-
MMBtu
$32,922
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs