ITAC Assessment: TT0340
ITAC logo
ITAC Assessment: TT0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Alternators
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 650,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,411,870 12,840,221
kWh
Electricity Demand $469,035 29,488
kW-mo/yr
Natural Gas $262,379 69,965
MMBtu
Waste Disposal Costs
Water Usage $35,343 50,421
Tgal
Water Disposal $36,840 50,421
Tgal
TOTAL YEARLY COSTS $2,215,467
RECOMMENDED SAVINGS* $713,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $194,175 $1,500 $162,072
1,473,382
kWh
$32,103
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $149,724 $887,569 $149,724
1,361,123
kWh
-
03 2.6218: Turn off equipment when not in use $125,959 $10,087 $125,959
1,145,088
kWh
-
04 2.6218: Turn off equipment when not in use $76,635 $17,000 $76,635
696,680
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $66,750 $25,000 $66,750
606,818
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $48,393 $211,862 $39,040
354,905
kWh
$9,353
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,176 $200,000 $44,176
401,600
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,026 $16,500 $7,026
63,870
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $833 $700 $652
5,928
kWh
$181
-
kW-mo/yr
TOTAL RECOMMENDED $713,671 $1,370,218 $672,034
6,109,394
kWh
$41,637
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs