194
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Electronic connector manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0225 #02 Y:2019 | 02 | 2019 | Utilize higher efficiency lamps and/or ballasts | $24,037 | $53,169 | |
| TT0225 #01 Y:2019 | 01 | 2019 | Apply for investment incentives | $61,196 | $11,500 | |
| LE0475 #08 Y:2019 | 08 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,356 | $15,000 | |
| LE0475 #07 Y:2019 | 07 | 2019 | Replace existing hvac unit with high efficiency model | $13,604 | $56,575 | |
| LE0475 #06 Y:2019 | 06 | 2019 | Use / purchase optimum sized compressor | $11,265 | $46,000 | |
| LE0475 #05 Y:2019 | 05 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $50 | $200 | |
| LE0475 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $3,513 | $12,830 | |
| LE0475 #03 Y:2019 | 03 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $3,128 | $10,000 | |
| LE0475 #02 Y:2019 | 02 | 2019 | Install compressor air intakes in coolest locations | $1,177 | $2,000 | |
| LE0475 #01 Y:2019 | 01 | 2019 | Turn off equipment during breaks, reduce operating time | $9,240 | - | |
| AS0465 #06 Y:2018 | 06 | 2018 | Recover mechanical energy | $4,582 | $20,880 | |
| AS0465 #05 Y:2018 | 05 | 2018 | Reduce the pressure of compressed air to the minimum required | $10,608 | $3,900 | |
| AS0465 #04 Y:2018 | 04 | 2018 | Use computer programs to optimize hvac performance | $10,850 | $17,634 | |
| AS0465 #03 Y:2018 | 03 | 2018 | Modify process to reduce material use/cost | $41,936 | $1,100 | |
| AS0465 #02 Y:2018 | 02 | 2018 | Upgrade controls on compressors | $56,756 | $18,258 | |
| AS0465 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $66,350 | $43,576 | |
| SU0460 #08 Y:2018 | 08 | 2018 | Optimize plant power factor | $5,002 | $8,529 | |
| SU0460 #07 Y:2018 | 07 | 2018 | Utilize higher efficiency lamps and/or ballasts | $1,083 | $1,766 | |
| SU0460 #06 Y:2018 | 06 | 2018 | Utilize higher efficiency lamps and/or ballasts | $33,383 | $36,712 | |
| SU0460 #05 Y:2018 | 05 | 2018 | Reduce ventilation air | $5,101 | $1,528 |