Assessment Year | 2019 |
---|---|
Principal Product | Electronic Connectors |
NAICS | 334417: Electronic Connector Manufacturing |
SIC | 3678: Electronic Connectors |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 65,000,000
units
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $596,188 | 7,516,368 |
kWh
|
$0.079 | |
Electricity Demand | $69,546 | 16,790 |
kW-mo/yr
|
$4.14 | |
Electricity Fees | $26,638 | - |
|
- | |
Fuel Oil #1 | $9,660 | 936 |
MMBtu
|
$10.32 | |
Waste Disposal Costs | |||||
Water Usage | $52,240 | 14,767 |
Tgal
|
$3.54 | |
TOTAL YEARLY COSTS | $754,272 | ||||
RECOMMENDED SAVINGS* | $191,082 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $10,850 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $66,350 | $43,576 |
$61,428
767,852
kWh
|
$4,922
-
kW-mo/yr
|
- | |
02 | 2.4224: Upgrade controls on compressors | $56,756 | $18,258 |
$50,818
632,715
kWh
|
$5,938
-
kW-mo/yr
|
- | |
03 | 4.131: Modify process to reduce material use/cost | $41,936 | $1,100 |
$592
7,398
kWh
|
- | $41,344 | |
04 | 2.7226: Use computer programs to optimize hvac performance | $10,850 | $17,634 |
$9,697
121,210
kWh
|
$1,153
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,608 | $3,900 |
$10,608
132,604
kWh
|
- | - | |
06 | 2.4311: Recover mechanical energy | $4,582 | $20,880 |
$4,066
50,815
kWh
|
$516
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $191,082 | $105,348 |
$137,209
1,712,594
kWh
|
$12,529
-
kW-mo/yr
|
$41,344 | ||
TOTAL IMPLEMENTED | $10,850 | $17,634 |
$9,697
121,210
kWh
|
$1,153
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs