ITAC Assessment: AS0465
ITAC logo
ITAC Assessment: AS0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Electronic Connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 65,000,000
units
Production Hrs. Annual 4,500
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $596,188 7,516,368
kWh
Electricity Demand $69,546 16,790
kW-mo/yr
Electricity Fees $26,638 -
Fuel Oil #1 $9,660 936
MMBtu
Waste Disposal Costs
Water Usage $52,240 14,767
Tgal
TOTAL YEARLY COSTS $754,272
RECOMMENDED SAVINGS* $191,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $66,350 $43,576 $61,428
767,852
kWh
$4,922
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $56,756 $18,258 $50,818
632,715
kWh
$5,938
-
kW-mo/yr
-
03 4.131: Modify process to reduce material use/cost $41,936 $1,100 $592
7,398
kWh
- $41,344
04 2.7226: Use computer programs to optimize hvac performance $10,850 $17,634 $9,697
121,210
kWh
$1,153
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,608 $3,900 $10,608
132,604
kWh
- -
06 2.4311: Recover mechanical energy $4,582 $20,880 $4,066
50,815
kWh
$516
-
kW-mo/yr
-
TOTAL RECOMMENDED $191,082 $105,348 $137,209
1,712,594
kWh
$12,529
-
kW-mo/yr
$41,344
TOTAL IMPLEMENTED $10,850 $17,634 $9,697
121,210
kWh
$1,153
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs