ITAC Assessment: SF0353
ITAC logo
ITAC Assessment: SF0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Bottled wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 120,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 4,368
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,017 2,768,977
kWh
Electricity Demand $85 7,499
kW-mo/yr
Electricity Fees $11,841 -
Natural Gas $64,484 5,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $168,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $9,294 $2,185 $6,479
72,592
kWh
$2,815
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,063 $1,355 $2,063
23,115
kWh
- -
03 2.7135: Install occupancy sensors $2,458 $2,016 $1,105
12,378
kWh
$1,353
-
kW-mo/yr
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $45,262 $60,000 $33,122
354,757
kWh
$12,140
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,324 $2,426 $1,324
14,838
kWh
- -
06 2.2437: Recover waste heat from equipment $9,259 $18,610 - - $9,259
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $853 $1,675 $853
9,561
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $89,877 $118,644 $75,000
840,336
kWh
$14,877
-
kW-mo/yr
-
09 2.4322: Use or replace with energy efficient substitutes $4,960 $24,943 $3,946
44,217
kWh
$1,014
-
kW-mo/yr
-
10 2.2437: Recover waste heat from equipment $1,273 $11,479 $542
6,079
kWh
- $731
-
MMBtu
11 2.2511: Insulate bare equipment $2,256 $22,235 $2,256
25,276
kWh
- -
TOTAL RECOMMENDED $168,879 $265,568 $126,690
1,403,149
kWh
$32,199
-
kW-mo/yr
$9,990
-
MMBtu
TOTAL IMPLEMENTED $99,551 $167,838 $82,307
922,207
kWh
$17,244
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs