Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Cable Connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $50
M
to 100
M
# of Employees 315
Plant Area 150,817
ft2
Annual Production 328,816,354
units
Production Hrs. Annual 5,200
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,437 6,924,075
kWh
Electricity Demand $180,476 15,013
kW-mo/yr
Electricity Fees $8,884 -
Natural Gas $14,558 2,528
MMBtu
TOTAL YEARLY COSTS $490,355
RECOMMENDED SAVINGS* $62,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $6,991 $352 $1,791
43,680
kWh
$6,058
-
kW-mo/yr
- $(-858.0)
-
MMBtu
- -
02 2.4322: Use or replace with energy efficient substitutes $1,582 $126 $269
6,552
kWh
$1,313
-
kW-mo/yr
- - - -
03 2.8121: Apply for tax-free status for energy purchases $862 $99 - - - - - $862
04 3.1161: Eliminate/reduce an operation $8,653 $3,004 $(-59.0)
(-1,440)
kWh
$(-433.0)
-
kW-mo/yr
- - $3,624 $5,521
05 2.7314: Reduce ventilation air $5,101 $1,528 $1,739
42,411
kWh
- - $3,362
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $33,383 $36,712 $21,873
533,494
kWh
$9,267
-
kW-mo/yr
- - $3,473 $(-1,230.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,083 $1,766 $579
14,126
kWh
$465
-
kW-mo/yr
- - $55 $(-16.0)
08 2.3212: Optimize plant power factor $5,002 $8,529 - - $5,002 - - -
TOTAL RECOMMENDED $62,657 $52,116 $26,192
638,823
kWh
$16,670
-
kW-mo/yr
$5,002 $2,504
-
MMBtu
$7,152 $5,137
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs