Assessment Year | 1996 |
---|---|
Principal Product | Laminated Kraft Sheets |
NAICS |
n/a
|
SIC | 2631: Paperboard Mills |
Sales Range | $10 M to 50M |
# of Employees | 91 |
Plant Area |
102,950
ft2
|
Annual Production | 39,000
ton
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,432 | 1,810,082 |
kWh
|
$0.018 |
Electricity Demand | $89,448 | 5,850 |
kW-mo/yr
|
$15.29 |
Electricity Fees | $1,578 | - |
|
- |
Natural Gas | $46,582 | 9,870 |
MMBtu
|
$4.72 |
LPG | $11,595 | 1,123 |
MMBtu
|
$10.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,741 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,351 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,833 | $500 | - | - |
$6,833
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,120 | $600 |
$1,120
62,720
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,630 | $1,950 | - | - |
$1,630
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,768 | $430 |
$624
34,877
kWh
|
$2,144
-
kW-mo/yr
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $3,639 | $4,232 | - | - |
$3,639
-
MMBtu
|
- | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $751 | $200 | - | - | - |
$751
-
Tgal
|
|
TOTAL RECOMMENDED | $16,741 | $7,912 |
$1,744
97,597
kWh
|
$2,144
-
kW-mo/yr
|
$12,102
-
MMBtu
|
$751
-
Tgal
|
||
TOTAL IMPLEMENTED | $12,351 | $3,480 |
$1,744
97,597
kWh
|
$2,144
-
kW-mo/yr
|
$8,463
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs