ITAC Assessment: OD0057
ITAC logo
ITAC Assessment: OD0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Laminated Kraft Sheets
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 102,950
ft2
Annual Production 39,000
ton
Production Hrs. Annual 3,120
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,432 1,810,082
kWh
Electricity Demand $89,448 5,850
kW-mo/yr
Electricity Fees $1,578 -
Natural Gas $46,582 9,870
MMBtu
LPG $11,595 1,123
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,833 $500 - - $6,833
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,120 $600 $1,120
62,720
kWh
- - -
03 2.2437: Recover waste heat from equipment $1,630 $1,950 - - $1,630
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,768 $430 $624
34,877
kWh
$2,144
-
kW-mo/yr
- -
05 2.2414: Use waste heat from hot flue gases to preheat $3,639 $4,232 - - $3,639
-
MMBtu
-
06 3.4116: Meter recycled water (to reduce sewer charges) $751 $200 - - - $751
-
Tgal
TOTAL RECOMMENDED $16,741 $7,912 $1,744
97,597
kWh
$2,144
-
kW-mo/yr
$12,102
-
MMBtu
$751
-
Tgal
TOTAL IMPLEMENTED $12,351 $3,480 $1,744
97,597
kWh
$2,144
-
kW-mo/yr
$8,463
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs