ITAC Assessment: UD0452
ITAC logo
ITAC Assessment: UD0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product recycled paper and metal
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 75,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,425 949,004
kWh
Natural Gas $3,484 644
MMBtu
Fuel Oil #2 $132,172 20,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $620 - - $620
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,950 - $8,950
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,856 $4,320 $1,856
32,825
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $680 $880 $680
12,016
kWh
-
TOTAL RECOMMENDED $12,106 $5,200 $11,486
44,841
kWh
$620
TOTAL IMPLEMENTED $8,950 - $8,950
-
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs