Assessment Year | 1995 |
---|---|
Principal Product | Frozen Fruit Pies |
NAICS |
n/a
|
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
16,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,138 | 2,983,001 |
kWh
|
$0.058 |
LPG | $30,984 | 5,154 |
MMBtu
|
$6.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,397 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,481 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $380 | $31 |
$380
6,155
kWh
|
- | - | |
02 | 2.2136: Install / repair insulation on steam lines | $884 | $468 | - |
$884
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,037 | $276 |
$1,037
15,533
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $667 | $532 |
$667
4,396
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $217 | $980 |
$217
3,517
kWh
|
- | - | |
06 | 2.2612: Use cooling tower water instead of refrigeration | $64,115 | $12,675 |
$64,115
1,038,101
kWh
|
- | - | |
07 | 2.5194: Redesign process | $12,097 | $15,250 |
$(-3,263.0)
(-54,220)
kWh
|
- | $15,360 | |
TOTAL RECOMMENDED | $79,397 | $30,212 |
$63,153
1,013,482
kWh
|
$884
-
MMBtu
|
$15,360 | ||
TOTAL IMPLEMENTED | $1,481 | $1,479 |
$597
9,672
kWh
|
$884
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs