| Assessment Year | 1995 |
|---|---|
| Principal Product | Frozen Fruit Pies |
| NAICS |
n/a
|
| SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
16,000
ft2
|
| Annual Production | 10,000,000
lb
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $173,138 | 2,983,001 |
kWh
|
$0.058 |
| LPG | $30,984 | 5,154 |
MMBtu
|
$6.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $79,397 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,481 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $380 | $31 |
$380
6,155
kWh
|
- | - | |
| 02 | 2.2136: Install / repair insulation on steam lines | $884 | $468 | - |
$884
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,037 | $276 |
$1,037
15,533
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $667 | $532 |
$667
4,396
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $217 | $980 |
$217
3,517
kWh
|
- | - | |
| 06 | 2.2612: Use cooling tower water instead of refrigeration | $64,115 | $12,675 |
$64,115
1,038,101
kWh
|
- | - | |
| 07 | 2.5194: Redesign process | $12,097 | $15,250 |
$(-3,263.0)
(-54,220)
kWh
|
- | $15,360 | |
| TOTAL RECOMMENDED | $79,397 | $30,212 |
$63,153
1,013,482
kWh
|
$884
-
MMBtu
|
$15,360 | ||
| TOTAL IMPLEMENTED | $1,481 | $1,479 |
$597
9,672
kWh
|
$884
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs