Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Capacitor, resistor, coil, transformer, and other inductor manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2509 #09 Y:2025 Utilize controls to operate equipment only when needed $13,478 $50
UC2509 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $29,692 $9,100
UC2509 #07 Y:2025 Insulate bare equipment $8,347 $2,798
UC2509 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,269 $1,190
UC2509 #05 Y:2025 Replace boiler $42,258 $132,297
UC2509 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $2,936 $100
UC2509 #03 Y:2025 Optimize plant power factor $19,546 $32,370
UC2509 #02 Y:2025 Pay utility bills on time $114 -
UC2509 #01 Y:2025 Apply for tax-free status for energy purchases $28,237 -
SJ0029 #06 Y:2024 Change rate schedules or other changes in utility service $10,952 -
SJ0029 #05 Y:2024 Insulate bare equipment $378 $574
SJ0029 #04 Y:2024 Install vinyl strip / high speed / air curtain doors $2,874 $6,782
SJ0029 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $78 -
SJ0029 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,400 $1,940
SJ0029 #01 Y:2024 Use solar heat to make electricty $137,645 $376,457
OR0790 #03 Y:2024 Eliminate or reduce compressed air usage $120 $116
OR0790 #02 Y:2024 Use solar heat to make electricty $12,196 $107,553
OR0790 #01 Y:2024 Contract a wood pallet recycling company $19,663 -
NL0067 #06 Y:2022 Install timers and/or thermostats $6,637 $204
NL0067 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $6,938 $2,000