Assessment Year | 2021 |
---|---|
Principal Product | Capacitors |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675: Electronic Capacitors |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
128,500
ft2
|
Annual Production | 11,000,000
units
|
Production Hrs. Annual | 2,400
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $38,955 | 1,045,316 |
kWh
|
$0.037 | |
Electricity Demand | $122,654 | 5,589 |
kW-mo/yr
|
$21.95 | |
Electricity Fees | $34,321 | - |
|
- | |
Natural Gas | $27,191 | 4,529 |
MMBtu
|
$6.00 | |
Waste Disposal Costs | |||||
Water Usage | $3,759 | 2,148 |
Tgal
|
$1.75 | |
Water Disposal | $6,943 | 2,148 |
Tgal
|
$3.23 | |
TOTAL YEARLY COSTS | $233,824 | ||||
RECOMMENDED SAVINGS* | $39,383 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $30,026 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,547 | $51,468 |
$4,942
133,806
kWh
|
$20,520
-
kW-mo/yr
|
$4,086 | - | |
02 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $8,198 | $50,347 |
$7,255
196,090
kWh
|
$503
-
kW-mo/yr
|
$440 | - | |
03 | 2.7135: Install occupancy sensors | $702 | $4,153 |
$702
18,989
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $479 | $500 |
$1,459
39,411
kWh
|
- | $(-880.0) | $(-100.0) | |
05 | 2.4221: Install compressor air intakes in coolest locations | $318 | $1,350 |
$318
8,593
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $139 | $220 |
$139
3,759
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $39,383 | $108,038 |
$14,815
400,648
kWh
|
$21,022
-
kW-mo/yr
|
$3,646 | $(-100.0) | ||
TOTAL IMPLEMENTED | $30,026 | $51,968 |
$6,401
173,217
kWh
|
$20,520
-
kW-mo/yr
|
$3,206 | $(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs