ITAC Assessment: LL0323
ITAC logo
ITAC Assessment: LL0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Hot Sauce
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 12,500
ft2
Annual Production 1,840,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $386,615 4,161,421
kWh
Electricity Fees $19,342 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $116,211

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $116,211 $8,680 $110,677
1,191,352
kWh
$5,534
02 2.7224: Reduce space conditioning during non-working hours $8,990 $990 $8,562
92,160
kWh
$428
03 2.7224: Reduce space conditioning during non-working hours $1,498 $990 $1,427
15,362
kWh
$71
04 2.6211: Conserve energy by efficient use of vending machines $682 $623 $649
6,989
kWh
$33
05 2.7111: Reduce illumination to minimum necessary levels $315 $190 $300
3,233
kWh
$15
TOTAL RECOMMENDED $127,696 $11,473 $121,615
1,309,096
kWh
$6,081
TOTAL IMPLEMENTED $116,211 $8,680 $110,677
1,191,352
kWh
$5,534
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs