Assessment Year | 2022 |
---|---|
Principal Product | Resistors |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3676: Electronic Resistors |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
118,340
ft2
|
Annual Production | 210,000,000
pieces
|
Production Hrs. Annual | 5,610
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $585,185 | 12,827,900 |
kWh
|
$0.046 | |
Electricity Demand | $381,885 | 26,707 |
kW-mo/yr
|
$14.30 | |
Electricity Fees | $26,997 | - |
|
- | |
Natural Gas | $48,011 | 6,594 |
MMBtu
|
$7.28 | |
Waste Disposal Costs | |||||
Water Usage | $9,553 | 3,538 |
Tgal
|
$2.70 | |
Water Disposal | $26,242 | 3,538 |
Tgal
|
$7.42 | |
TOTAL YEARLY COSTS | $1,077,873 | ||||
RECOMMENDED SAVINGS* | $107,382 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $31,946 | $130,000 |
$22,405
487,056
kWh
|
$9,541
-
kW-mo/yr
|
- | - | |
02 | 2.4224: Upgrade controls on compressors | $25,304 | $17,000 |
$25,304
550,091
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,057 | $45,606 |
$11,352
246,660
kWh
|
$6,784
-
kW-mo/yr
|
$2,921 | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $15,500 | $25,400 |
$15,500
336,960
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,938 | $2,000 |
$8,002
173,962
kWh
|
- | $(-864.0) | $(-200.0) | |
06 | 2.7261: Install timers and/or thermostats | $6,637 | $204 |
$6,637
144,288
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $107,382 | $220,210 |
$89,200
1,939,017
kWh
|
$16,325
-
kW-mo/yr
|
$2,057 | $(-200.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs