Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

328

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Semiconductor and related device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2203 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $11,676 $7,295
UW2203 #03 Y:2022 Install occupancy sensors $3,397 $1,678
UW2203 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $20,500 $10,782
UW2203 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $8,698 -
SF0585 #07 Y:2022 Change procedures / equipment / operating conditions $17,102 $105,401
SF0585 #06 Y:2022 Use solar heat to make electricty $95,415 $561,099
SF0585 #05 Y:2022 Develop a repair/replace policy $3,867 $8,345
SF0585 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $897 $400
SF0585 #03 Y:2022 Use cooling tower or economizer to replace chiller cooling $23,840 $8,000
SF0585 #02 Y:2022 Reduce space conditioning during non-working hours $10,174 $2,893
SF0585 #01 Y:2022 Turn off equipment when not in use $1,341 -
OR0741 #03 Y:2021 Use heat pump for space conditioning $25,522 $19,860
OR0741 #02 Y:2021 Use a less expensive method of waste removal $56,371 -
OR0741 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $16,176 $40,448
DL0190 #08 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,730 $2,453
DL0190 #07 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $560 $550
DL0190 #06 Y:2021 Turn off equipment when not in use $270 -
DL0190 #05 Y:2021 Use or replace with energy efficient substitutes $361 $1,200
DL0190 #04 Y:2021 Reduce space conditioning during non-working hours $1,650 -
DL0190 #03 Y:2021 Utilize controls to operate equipment only when needed $324 $50