ITAC Assessment: UW2203
ITAC logo
ITAC Assessment: UW2203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Semiconductor and Related Device Manufacturing
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 264,132
ft2
Annual Production 42,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,163 3,555,200
kWh
Natural Gas $55,122 5,269
MMBtu
Waste Disposal Costs
Water Usage $6,503 323
Tgal
TOTAL YEARLY COSTS $411,788
RECOMMENDED SAVINGS* $307,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $8,698 - $8,698
88,301
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,500 $10,782 $20,500
208,120
kWh
03 2.7135: Install occupancy sensors $3,397 $1,678 $3,397
34,485
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,676 $7,295 $11,676
118,540
kWh
05 2.9114: Use solar heat to make electricty $262,732 $1,628,434 $262,732
2,667,328
kWh
TOTAL RECOMMENDED $307,002 $1,648,188 $307,002
3,116,773
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs