Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLUOROPOLYMER PUMPS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,014 2,449,004
kWh
Natural Gas $34,173 7,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $4,347 $6,000 $4,347
-
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,671 $2,800 $2,671
46,307
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,024 $100 $3,024
-
kWh
-
04 2.2491: Use cooling air which cools hot work pieces for space heating $4,283 $7,500 - $4,283
-
MMBtu
05 2.2437: Recover waste heat from equipment $639 $2,500 - $639
-
MMBtu
TOTAL RECOMMENDED $14,964 $18,900 $10,042
46,307
kWh
$4,922
-
MMBtu
TOTAL IMPLEMENTED $4,986 $8,500 $4,347
-
kWh
$639
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs