ITAC Assessment: OR0741
ITAC logo
ITAC Assessment: OR0741
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Semiconductor Products and Contract Manufacturing
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 170,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 2,800
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,254 3,122,138
kWh
Electricity Demand $46,933 7,097
kW-mo/yr
Electricity Fees $63,157 -
Natural Gas $30,875 3,442
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $44,660 812,000
lb
TOTAL YEARLY COSTS $367,879
RECOMMENDED SAVINGS* $98,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,176 $40,448 $11,499
159,861
kWh
$3,962
-
kW-mo/yr
- - $1,150 $(-435.0)
02 3.6192: Use a less expensive method of waste removal $56,371 - - - - $56,371
-
lb
- -
03 2.7234: Use heat pump for space conditioning $25,522 $19,860 $18,301
254,430
kWh
$16,502
-
kW-mo/yr
$(-9,281.0)
-
MMBtu
- - -
TOTAL RECOMMENDED $98,069 $60,308 $29,800
414,291
kWh
$20,464
-
kW-mo/yr
$(-9,281.0)
-
MMBtu
$56,371
-
lb
$1,150 $(-435.0)
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs