ITAC Assessment: HO0085
ITAC logo
ITAC Assessment: HO0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product 55 Gallon Steel Drums
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 152
Plant Area 160,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 3,016
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $521,741 5,723,036
kWh
Natural Gas $379,446 84,311
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,495 $3,924 $2,495
27,550
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $625 $1,454 $625
6,741
kWh
03 2.4133: Use most efficient type of electric motors $1,113 $3,292 $1,113
12,309
kWh
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,316 - $2,316
-
kWh
TOTAL RECOMMENDED $6,549 $8,670 $6,549
46,600
kWh
TOTAL IMPLEMENTED $3,120 $5,378 $3,120
34,291
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs