Assessment Year | 2008 |
---|---|
Principal Product | Electrical Outlet Boxes |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3644: Noncurrent-Carrying Wiring Devices |
Sales Range | $100 M to 500M |
# of Employees | 379 |
Plant Area |
3,250,000
ft2
|
Annual Production | 48,780
ton
|
Production Hrs. Annual | 6,500
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $675,270 | 16,645,080 |
kWh
|
$0.041 |
Electricity Demand | $538,444 | 34,362 |
kW-mo/yr
|
$15.67 |
Electricity Fees | $30,107 | - |
|
- |
Natural Gas | $208,705 | 16,667 |
MMBtu
|
$12.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $276,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $10,000 | $2,500 | - | - |
$10,000
-
MMBtu
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $23,950 | $15,491 | - | - |
$23,950
-
MMBtu
|
- | |
03 | 2.4224: Upgrade controls on compressors | $23,300 | $50,530 |
$23,300
466,772
kWh
|
- | - | - | |
04 | 2.2113: Repair or replace steam traps | $7,750 | $4,800 |
$7,750
161,500
kWh
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $13,400 | $13,400 |
$13,400
278,800
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,600 | $10,900 |
$22,600
470,900
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $154,961 | $376,774 |
$86,870
1,810,166
kWh
|
$47,591
-
kW-mo/yr
|
- | $20,500 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,022 | $14,263 |
$4,638
96,654
kWh
|
$3,710
-
kW-mo/yr
|
- | $1,674 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,966 | $13,554 |
$2,388
49,751
kWh
|
$3,525
-
kW-mo/yr
|
- | $1,053 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,304 | $26,136 |
$633
13,200
kWh
|
$507
-
kW-mo/yr
|
- | $1,164 | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $308 | $150 |
$76
1,584
kWh
|
$61
-
kW-mo/yr
|
- | $171 | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $559 | $683 |
$212
4,415
kWh
|
$116
-
kW-mo/yr
|
- | $231 | |
TOTAL RECOMMENDED | $276,120 | $529,181 |
$161,867
3,353,742
kWh
|
$55,510
-
kW-mo/yr
|
$33,950
-
MMBtu
|
$24,793 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs