Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,733

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Semiconductor and other electronic component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0201 #03 Y:2023 Use waste heat from hot flue gases to preheat $3,633 $7,520
WM0201 #02 Y:2023 Meter recycled water (to reduce sewer charges) $7,589 $2,500
WM0201 #01 Y:2023 Use waste heat from hot flue gases to preheat $15,913 $15,200
WM0199 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,125 $1,662
WM0199 #04 Y:2023 Use compressor air filters $1,447 $2,189
WM0199 #03 Y:2023 Install compressor air intakes in coolest locations $1,889 $2,175
WM0199 #02 Y:2023 Lower temperature during the winter season and vice-versa $12,348 -
WM0199 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $22,795 $44,389
CI0007 #08 Y:2023 Schedule use of elevators to conserve energy $663 -
CI0007 #07 Y:2023 Reduce the pressure of compressed air to the minimum required $853 -
CI0007 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,123 $836
CI0007 #05 Y:2023 Recharge batteries on during off-peak demand periods $2,887 $50
CI0007 #04 Y:2023 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $3,248 $4,500
CI0007 #03 Y:2023 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $4,072 $15,610
CI0007 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $9,880 $300
CI0007 #01 Y:2023 Turn off equipment when not in use $52,065 -
DL0220 #12 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,150 $8,994
DL0220 #11 Y:2023 Recover waste heat from equipment $1,387 $6,500
DL0220 #10 Y:2023 Recover waste heat from equipment $6,153 $9,740
DL0220 #09 Y:2023 Use cooling tower or economizer to replace chiller cooling $6,332 $20,000