Assessment Year | 2023 |
---|---|
Principal Product | electronic assemblies and devices for networking, medical, industrial and telecom industries |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 849 |
Plant Area |
473,073
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $607,624 | 10,466,788 |
kWh
|
$0.058 | |
Electricity Demand | $299,729 | 20,718 |
kW-mo/yr
|
$14.47 | |
Electricity Fees | $140,606 | - |
|
- | |
Natural Gas | $209,537 | 25,572 |
MMBtu
|
$8.19 | |
Waste Disposal Costs | |||||
Water Usage | $23,407 | 4,050 |
Tgal
|
$5.78 | |
Water Disposal | $76,819 | 4,050 |
Tgal
|
$18.97 | |
TOTAL YEARLY COSTS | $1,357,722 | ||||
RECOMMENDED SAVINGS* | $39,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $24,242 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,795 | $44,389 |
$10,939
156,274
kWh
|
$12,364
-
kW-mo/yr
|
$(-508.0)
-
MMBtu
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $12,348 | - | - | - |
$12,348
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $1,889 | $2,175 |
$1,393
24,021
kWh
|
$496
-
kW-mo/yr
|
- | |
04 | 2.4227: Use compressor air filters | $1,447 | $2,189 |
$1,067
18,394
kWh
|
$380
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,125 | $1,662 |
$954
16,449
kWh
|
$171
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $39,604 | $50,415 |
$14,353
215,138
kWh
|
$13,411
-
kW-mo/yr
|
$11,840
-
MMBtu
|
||
TOTAL IMPLEMENTED | $24,242 | $46,578 |
$12,006
174,668
kWh
|
$12,744
-
kW-mo/yr
|
$(-508.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs