ITAC Assessment: WM0199
ITAC logo
ITAC Assessment: WM0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product electronic assemblies and devices for networking, medical, industrial and telecom industries
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 849
Plant Area 473,073
ft2
Annual Production 10,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $607,624 10,466,788
kWh
Electricity Demand $299,729 20,718
kW-mo/yr
Electricity Fees $140,606 -
Natural Gas $209,537 25,572
MMBtu
Waste Disposal Costs
Water Usage $23,407 4,050
Tgal
Water Disposal $76,819 4,050
Tgal
TOTAL YEARLY COSTS $1,357,722
RECOMMENDED SAVINGS* $39,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,795 $44,389 $10,939
156,274
kWh
$12,364
-
kW-mo/yr
$(-508.0)
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $12,348 - - - $12,348
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,889 $2,175 $1,393
24,021
kWh
$496
-
kW-mo/yr
-
04 2.4227: Use compressor air filters $1,447 $2,189 $1,067
18,394
kWh
$380
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,125 $1,662 $954
16,449
kWh
$171
-
kW-mo/yr
-
TOTAL RECOMMENDED $39,604 $50,415 $14,353
215,138
kWh
$13,411
-
kW-mo/yr
$11,840
-
MMBtu
TOTAL IMPLEMENTED $24,242 $46,578 $12,006
174,668
kWh
$12,744
-
kW-mo/yr
$(-508.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs