ITAC Assessment: SD0183
ITAC logo
ITAC Assessment: SD0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Produce complex formed and welded assembles, ie. hydraulic r
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 60,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,334
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,334 1,116,061
kWh
Electricity Demand $73,766 4,441
kW-mo/yr
Natural Gas $5,436 706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $217,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,891

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $14,050 $4,000 $6,958
131,301
kWh
$6,245
-
kW-mo/yr
$847
-
MMBtu
- - -
02 2.2515: Use optimum thickness insulation $6,107 $570 - $4,783
-
kW-mo/yr
$1,324
-
MMBtu
- - -
03 2.7261: Install timers and/or thermostats $2,086 $1,800 $2,086
39,273
kWh
- - - - -
04 2.4239: Eliminate or reduce compressed air usage $915 $650 $500
9,379
kWh
$415
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $872 $950 $507
9,672
kWh
$365
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,385 $11,002 $2,458
46,307
kWh
$927
-
kW-mo/yr
- - - -
07 2.7144: Install spectral reflectors / delamp $7,155 $9,085 $5,128
96,717
kWh
$2,027
-
kW-mo/yr
- - - -
08 3.7197: Use ultrasonic cleaning $11,564 $1,140 - - - - $11,564
-
gal
-
09 3.8224: Convert to less toxic hydrocarbon cleaners $6,144 - - - - - $6,144
-
gal
-
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,640 $2,000 - - - - - $2,640
11 3.4113: Treat and reuse rinse waters $185 $100 - - - $185
-
gal
- -
12 4.652: Replace existing equipment with more suitable substitutes $162,000 $250,000 - - - - - $162,000
TOTAL RECOMMENDED $217,103 $281,297 $17,637
332,649
kWh
$14,762
-
kW-mo/yr
$2,171
-
MMBtu
$185
-
gal
$17,708
-
gal
$164,640
TOTAL IMPLEMENTED $23,891 $21,407 $8,086
152,403
kWh
$8,152
-
kW-mo/yr
$1,324
-
MMBtu
$185
-
gal
$6,144
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs