| Assessment Year | 1997 |
|---|---|
| Principal Product | Produce complex formed and welded assembles, ie. hydraulic r |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
60,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 4,334
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,334 | 1,116,061 |
kWh
|
$0.053 |
| Electricity Demand | $73,766 | 4,441 |
kW-mo/yr
|
$16.61 |
| Natural Gas | $5,436 | 706 |
MMBtu
|
$7.70 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $217,103 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,891 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $14,050 | $4,000 |
$6,958
131,301
kWh
|
$6,245
-
kW-mo/yr
|
$847
-
MMBtu
|
- | - | - | |
| 02 | 2.2515: Use optimum thickness insulation | $6,107 | $570 | - |
$4,783
-
kW-mo/yr
|
$1,324
-
MMBtu
|
- | - | - | |
| 03 | 2.7261: Install timers and/or thermostats | $2,086 | $1,800 |
$2,086
39,273
kWh
|
- | - | - | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $915 | $650 |
$500
9,379
kWh
|
$415
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $872 | $950 |
$507
9,672
kWh
|
$365
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,385 | $11,002 |
$2,458
46,307
kWh
|
$927
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7144: Install spectral reflectors / delamp | $7,155 | $9,085 |
$5,128
96,717
kWh
|
$2,027
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 3.7197: Use ultrasonic cleaning | $11,564 | $1,140 | - | - | - | - |
$11,564
-
gal
|
- | |
| 09 | 3.8224: Convert to less toxic hydrocarbon cleaners | $6,144 | - | - | - | - | - |
$6,144
-
gal
|
- | |
| 10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,640 | $2,000 | - | - | - | - | - | $2,640 | |
| 11 | 3.4113: Treat and reuse rinse waters | $185 | $100 | - | - | - |
$185
-
gal
|
- | - | |
| 12 | 4.652: Replace existing equipment with more suitable substitutes | $162,000 | $250,000 | - | - | - | - | - | $162,000 | |
| TOTAL RECOMMENDED | $217,103 | $281,297 |
$17,637
332,649
kWh
|
$14,762
-
kW-mo/yr
|
$2,171
-
MMBtu
|
$185
-
gal
|
$17,708
-
gal
|
$164,640 | ||
| TOTAL IMPLEMENTED | $23,891 | $21,407 |
$8,086
152,403
kWh
|
$8,152
-
kW-mo/yr
|
$1,324
-
MMBtu
|
$185
-
gal
|
$6,144
-
gal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs