ITAC Assessment: BD0046
ITAC logo
ITAC Assessment: BD0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Hydraulic door closers
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area 177,886
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,692 6,533,705
kWh
Electricity Demand $18,348 28,634
kW-mo/yr
Electricity Fees $69,075 -
Natural Gas $95,631 29,296
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $34,399 $31,000 $40,283
657,386
kWh
$4,114
-
kW-mo/yr
$(-9,998.0)
-
MMBtu
- - -
02 2.4133: Use most efficient type of electric motors $15,921 $36,930 $15,563
322,098
kWh
$358
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $4,119 $2,550 $4,022
83,236
kWh
$97
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,521 $60 $1,498
31,067
kWh
$23
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,301 $5,169 $1,251
25,791
kWh
$50
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $487 $750 $477
9,965
kWh
$10
-
kW-mo/yr
- - - -
07 3.4113: Treat and reuse rinse waters $29,772 $60,000 - - - $29,772
-
Tgal
- -
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $11,229 $650 - - - - $11,229
-
gal
-
09 3.5316: Contract a wood pallet recycling company $5,349 $370 - - - - - $5,349
-
lb
10 3.4115: Recover and reuse cooling water $3,860 $8,200 - - - $3,860
-
Tgal
- -
TOTAL RECOMMENDED $107,958 $145,679 $63,094
1,129,543
kWh
$4,652
-
kW-mo/yr
$(-9,998.0)
-
MMBtu
$33,632
-
Tgal
$11,229
-
gal
$5,349
-
lb
TOTAL IMPLEMENTED $34,091 $45,359 $22,334
462,192
kWh
$528
-
kW-mo/yr
- - $11,229
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs