ITAC Assessment: DL0220
ITAC logo
ITAC Assessment: DL0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Optical fiber and optoelectronic devices
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 166,000
ft2
Annual Production 2,257,288
units
Production Hrs. Annual 4,450
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $879,344 6,380,263
kWh
Electricity Demand $98,516 13,019
kW-mo/yr
Electricity Fees $176 -
Natural Gas $65,526 5,592
MMBtu
TOTAL YEARLY COSTS $1,043,562
RECOMMENDED SAVINGS* $164,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,454

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $84,324 - $84,324
551,140
kWh
-
02 2.2211: Use optimum temperature $6,980 - $6,980
45,620
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $4,020 - - $4,020
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $10,928 - $5,349
34,962
kWh
$5,579
-
MMBtu
05 2.6231: Utilize controls to operate equipment only when needed $16,704 - $16,704
109,178
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $14,418 - $14,418
94,233
kWh
-
07 2.6231: Utilize controls to operate equipment only when needed $3,578 - $3,578
23,383
kWh
-
08 2.4239: Eliminate or reduce compressed air usage $4,694 - $4,694
30,681
kWh
-
09 2.2614: Use cooling tower or economizer to replace chiller cooling $6,332 $20,000 $6,332
41,384
kWh
-
10 2.2437: Recover waste heat from equipment $6,153 $9,740 - $6,153
-
MMBtu
11 2.2437: Recover waste heat from equipment $1,387 $6,500 - $1,387
-
MMBtu
12 2.7142: Utilize higher efficiency lamps and/or ballasts $5,150 $8,994 $5,150
33,660
kWh
-
TOTAL RECOMMENDED $164,668 $45,234 $147,529
964,241
kWh
$17,139
-
MMBtu
TOTAL IMPLEMENTED $96,454 $8,994 $96,454
630,420
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs