| Assessment Year | 2024 |
|---|---|
| Principal Product | semiconductor manufacturing machinery |
| NAICS | 333242: Semiconductor Machinery Manufacturing |
| SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
| Sales Range | less than $500 k |
| # of Employees | 332 |
| Plant Area |
150,653
ft2
|
| Annual Production | 1,000
units
|
| Production Hrs. Annual | 5,800
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $297,605 | 4,654,400 |
kWh
|
$0.064 | |
| Electricity Demand | $113,590 | 9,055 |
kW-mo/yr
|
$12.54 | |
| Electricity Fees | $31,616 | - |
|
- | |
| Natural Gas | $45,823 | 3,886 |
MMBtu
|
$11.79 | |
| Waste Disposal Costs | |||||
| Water Usage | $18,192 | 838 |
Tgal
|
$21.71 | |
| Solid Waste (non-haz) | $50,356 | 217,760 |
lb
|
$0.23 | |
| TOTAL YEARLY COSTS | $557,182 | ||||
| RECOMMENDED SAVINGS* | $22,793 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $18,414 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $13,182 | $130,619 |
$5,385
84,225
kWh
|
$1,438
-
kW-mo/yr
|
$6,359
-
MMBtu
|
|
| 02 | 2.2531: Re-size charging openings or add movable cover or door | $1,862 | - |
$1,862
29,124
kWh
|
- | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $4,379 | $1,271 |
$4,379
68,489
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,370 | $11,019 |
$3,370
52,710
kWh
|
- | - | |
| TOTAL RECOMMENDED | $22,793 | $142,909 |
$14,996
234,548
kWh
|
$1,438
-
kW-mo/yr
|
$6,359
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,414 | $141,638 |
$10,617
166,059
kWh
|
$1,438
-
kW-mo/yr
|
$6,359
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs