ITAC Assessment: OR0787
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product semiconductor manufacturing machinery
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 332
Plant Area 150,653
ft2
Annual Production 1,000
units
Production Hrs. Annual 5,800
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,605 4,654,400
kWh
Electricity Demand $113,590 9,055
kW-mo/yr
Electricity Fees $31,616 -
Natural Gas $45,823 3,886
MMBtu
Waste Disposal Costs
Water Usage $18,192 838
Tgal
Solid Waste (non-haz) $50,356 217,760
lb
TOTAL YEARLY COSTS $557,182
RECOMMENDED SAVINGS* $22,793 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $13,182 $130,619 $5,385
84,225
kWh
$1,438
-
kW-mo/yr
$6,359
-
MMBtu
02 2.2531: Re-size charging openings or add movable cover or door $1,862 - $1,862
29,124
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $4,379 $1,271 $4,379
68,489
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,370 $11,019 $3,370
52,710
kWh
- -
TOTAL RECOMMENDED $22,793 $142,909 $14,996
234,548
kWh
$1,438
-
kW-mo/yr
$6,359
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs