ITAC Assessment: CI0007
ITAC logo
ITAC Assessment: CI0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product PCBA and Electro-Mechanical Products
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 65,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,582 891,524
kWh
Electricity Demand $117,532 3,908
kW-mo/yr
Natural Gas $576 19
MMBtu
TOTAL YEARLY COSTS $226,690
RECOMMENDED SAVINGS* $75,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $52,065 - $52,065
427,481
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,880 $300 $7,880
64,696
kWh
$2,000
-
kW-mo/yr
03 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $4,072 $15,610 $4,072
33,431
kWh
-
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $3,248 $4,500 $1,431
11,750
kWh
$1,817
-
kW-mo/yr
05 2.3132: Recharge batteries on during off-peak demand periods $2,887 $50 - $2,887
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,123 $836 $1,888
15,504
kWh
$235
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $853 - $636
5,221
kWh
$217
-
kW-mo/yr
08 2.6223: Schedule use of elevators to conserve energy $663 - $663
5,445
kWh
-
TOTAL RECOMMENDED $75,791 $21,296 $68,635
563,528
kWh
$7,156
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs