ITAC Assessment: WM0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Medical devices
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 800
Plant Area 141,000
ft2
Annual Production 2,000
units
Production Hrs. Annual 6,552
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,901 4,225,355
kWh
Electricity Demand $77,649 9,216
kW-mo/yr
Electricity Fees $(-22,772.0) -
Natural Gas $95,233 15,322
MMBtu
Waste Disposal Costs
Water Usage $35,924 4,435
Tgal
Water Disposal $19,958 4,435
Tgal
TOTAL YEARLY COSTS $414,893
RECOMMENDED SAVINGS* $29,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.2414: Use waste heat from hot flue gases to preheat $15,913 $15,200 - - $15,913
-
MMBtu
-
02 3.4116: Meter recycled water (to reduce sewer charges) $7,589 $2,500 - - - $7,589
-
Tgal
03 2.2414: Use waste heat from hot flue gases to preheat $3,633 $7,520 - - $3,633
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,077 $1,814 $819
16,710
kWh
$258
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $1,042 $195 $838
17,108
kWh
$203
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,253 $27,229 $1,657
33,818
kWh
$461
-
kW-mo/yr
$19,546
-
MMBtu
$7,589
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs