Assessment Year | 1990 |
---|---|
Principal Product | STEEL PIPES |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
n/a
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,572 | 1,289,566 |
kWh
|
$0.11 |
Natural Gas | $48,722 | 9,906 |
MMBtu
|
$4.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,983 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,067 | $3,222 |
$3,067
28,136
kWh
|
- | |
02 | 2.7494: Install storm windows and doors | $3,800 | $8,566 | - |
$3,800
-
MMBtu
|
|
03 | 2.6232: Install set-back timers | $2,284 | $1,000 |
$2,284
20,809
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $975 | $500 | - |
$975
-
MMBtu
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $505 | - |
$505
4,689
kWh
|
- | |
06 | 2.2437: Recover waste heat from equipment | $489 | $1,500 | - |
$489
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $219 | $800 |
$219
2,052
kWh
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $508 | $700 | - |
$508
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,847 | $16,288 |
$6,075
55,686
kWh
|
$5,772
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,983 | $2,300 |
$3,008
27,550
kWh
|
$975
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs