ITAC Assessment: WI0094
ITAC logo
ITAC Assessment: WI0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product STEEL PIPES
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 30,000
ton
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,572 1,289,566
kWh
Natural Gas $48,722 9,906
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,067 $3,222 $3,067
28,136
kWh
-
02 2.7494: Install storm windows and doors $3,800 $8,566 - $3,800
-
MMBtu
03 2.6232: Install set-back timers $2,284 $1,000 $2,284
20,809
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $975 $500 - $975
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $505 - $505
4,689
kWh
-
06 2.2437: Recover waste heat from equipment $489 $1,500 - $489
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $219 $800 $219
2,052
kWh
-
08 2.2136: Install / repair insulation on steam lines $508 $700 - $508
-
MMBtu
TOTAL RECOMMENDED $11,847 $16,288 $6,075
55,686
kWh
$5,772
-
MMBtu
TOTAL IMPLEMENTED $3,983 $2,300 $3,008
27,550
kWh
$975
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs