Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BALL JOINTS, IDLE ARMS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 850,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,052 844,959
kWh
Natural Gas $5,980 1,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,854 $300 $1,854
59,496
kWh
-
02 2.7261: Install timers and/or thermostats $1,647 $552 $398
12,603
kWh
$1,249
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $749 $1,484 $749
18,757
kWh
-
04 2.6241: Reduce temperature of process equipment when on standby $43 $125 $43
1,465
kWh
-
TOTAL RECOMMENDED $4,293 $2,461 $3,044
92,321
kWh
$1,249
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs