ITAC Assessment: OK0238
ITAC logo
ITAC Assessment: OK0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product STEEL CASTINGS
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 94
Plant Area
n/a
Annual Production 1,500
ton
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,892 5,021,102
kWh
Natural Gas $141,985 33,087
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $263 $105 $263
4,103
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $964 - $1,334
39,566
kWh
- $(-370.0)
03 2.7261: Install timers and/or thermostats $17,160 $1,500 - $17,160
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $6,068 $2,500 - $6,068
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,923 $28,665 $8,923
143,025
kWh
- -
06 2.2515: Use optimum thickness insulation $1,643 $6,000 - $1,643
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $3,369 $1,219 - $3,369
-
MMBtu
-
TOTAL RECOMMENDED $38,390 $39,989 $10,520
186,694
kWh
$28,240
-
MMBtu
$(-370.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs