Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

755

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other general purpose machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0296 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $209 $500
UA0296 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $795 $250
UA0296 #03 Y:2025 Use photocell controls $906 $2,976
UA0296 #02 Y:2025 Optimize plant power factor $2,328 $1,262
UA0296 #01 Y:2025 Install compressor air intakes in coolest locations $9,191 $8,397
MZ0374 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,683 $8,662
MZ0374 #05 Y:2025 Remove or close off unneeded compressed air lines $1,884 $4,020
MZ0374 #04 Y:2025 Eliminate or reduce compressed air usage $10,170 $7,950
MZ0374 #03 Y:2025 Install occupancy sensors $165 $415
MZ0374 #02 Y:2025 Re-use or recycle hot or cold process exhaust air $4,818 $13,380
MZ0374 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,642 $3,212
TT0326 #10 Y:2025 Change procedures / equipment / operating conditions $47,285 $724,290
TT0326 #09 Y:2025 Use solar heat for heat $87,059 $375,030
TT0326 #08 Y:2025 Install occupancy sensors $1,871 $4,200
TT0326 #07 Y:2025 Adopt in-house material generation $50,975 $110,000
TT0326 #06 Y:2025 Initiate a program to acquire iso certification $8,775 $15,000
TT0326 #05 Y:2025 Optimize plant power factor $2,637 $3,000
TT0326 #04 Y:2025 Insulate bare equipment $3,234 $3,600
TT0326 #03 Y:2025 Avoid introducing hot, humid, or dirty air into hvac system $2,701 $2,400
TT0326 #02 Y:2025 Install timers and/or thermostats $7,420 $1,800