Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other general purpose machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0437 #04 Y:2024 Replace fossil fuel equipment with electrical equipment $288,884 $300,000
MS0437 #03 Y:2024 Install occupancy sensors $272 $2,237
MS0437 #02 Y:2024 Use solar heat to make electricty $34,017 $458,990
MS0437 #01 Y:2024 Lower temperature during the winter season and vice-versa $147 -
WV0672 #13 Y:2024 Install occupancy sensors $334 $984
WV0672 #12 Y:2024 Reduce the pressure of compressed air to the minimum required $401 $38
WV0672 #11 Y:2024 Optimize plant power factor $596 $2,964
WV0672 #10 Y:2024 Eliminate or reduce compressed air usage $797 $1,579
WV0672 #09 Y:2024 Install compressor air intakes in coolest locations $1,102 $753
WV0672 #08 Y:2024 Use or replace with energy efficient substitutes $1,640 $5,016
WV0672 #07 Y:2024 Upgrade controls on compressors $3,058 $6,936
WV0672 #06 Y:2024 Install vinyl strip / high speed / air curtain doors $3,489 $5,659
WV0672 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,087 $759
WV0672 #04 Y:2024 Reschedule plant operations or reduce load to avoid peaks $5,264 $9,760
WV0672 #03 Y:2024 Convert to high volume low pressure (hvlp) paint guns $20,948 $26,406
WV0672 #02 Y:2024 Use evaporation to concentrate material $24,278 $31,216
WV0672 #01 Y:2024 Use fossil fuel powered generator during peak demand periods $73,416 $271,368
UA0291 #06 Y:2024 Install occupancy sensors $107 $452
UA0291 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $688 $3,738
UA0291 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $531 $1,463