Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Fabrication, Assembly, and Coating
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 600,000
ft2
Annual Production 120,000
units
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $920,544 12,273,915
kWh
Natural Gas $336,495 46,490
MMBtu
TOTAL YEARLY COSTS $1,257,039
RECOMMENDED SAVINGS* $98,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,373 $1,000 $1,373
18,304
kWh
-
02 2.1224: Replace boiler $40,788 $280,768 - $40,788
-
MMBtu
03 2.9114: Use solar heat to make electricty $53,993 $469,350 $53,993
719,903
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,855 $3,973 $1,855
24,737
kWh
-
TOTAL RECOMMENDED $98,009 $755,091 $57,221
762,944
kWh
$40,788
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs