ITAC Assessment: OK0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product STEEL BUMPERS
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 36,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,525 636,577
kWh
Natural Gas $18,149 4,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2514: Cover open tanks $1,452 $545 - $1,452
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $1,261 $460 - $1,261
-
MMBtu
03 2.2511: Insulate bare equipment $281 $59 - $281
-
MMBtu
04 2.2511: Insulate bare equipment $6,730 $2,046 - $6,730
-
MMBtu
05 2.7422: Plant trees or shrubs near windows to shield from sunlight $90 $208 $90
2,638
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $51 $53 $51
879
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $88 $27 $88
2,638
kWh
-
TOTAL RECOMMENDED $9,953 $3,398 $229
6,155
kWh
$9,724
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs