ITAC Assessment: UA0296
ITAC logo
ITAC Assessment: UA0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Palletizing machines and service parts
NAICS 333993: Packaging Machinery Manufacturing
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 165,000
ft2
Annual Production 25
units
Production Hrs. Annual 2,500
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,701 2,221,800
kWh
Electricity Demand $37,444 6,603
kW-mo/yr
Electricity Fees $10,174 -
Natural Gas $45,109 31,602
MMBtu
TOTAL YEARLY COSTS $318,428
RECOMMENDED SAVINGS* $13,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4221: Install compressor air intakes in coolest locations $9,191 $8,397 $8,849
87,095
kWh
- $342
02 2.3212: Optimize plant power factor $2,328 $1,262 - - $2,328
03 2.7134: Use photocell controls $906 $2,976 $872
8,580
kWh
- $34
04 2.4231: Reduce the pressure of compressed air to the minimum required $795 $250 $581
5,717
kWh
$184
-
kW-mo/yr
$30
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $209 $500 $150
1,475
kWh
$51
-
kW-mo/yr
$8
TOTAL RECOMMENDED $13,429 $13,385 $10,452
102,867
kWh
$235
-
kW-mo/yr
$2,742
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs