ITAC Assessment: MZ0374
ITAC logo
ITAC Assessment: MZ0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Air filters
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 162
Plant Area 56,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,811 2,964,806
kWh
Electricity Demand $105,610 6,207
kW-mo/yr
Natural Gas $21,187 1,935
MMBtu
Waste Disposal Costs
Water Usage $2,786 526
Tgal
Water Disposal $1,944 526
Tgal
TOTAL YEARLY COSTS $333,338
RECOMMENDED SAVINGS* $24,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,642 $3,212 $1,642
24,143
kWh
- - -
02 2.2443: Re-use or recycle hot or cold process exhaust air $4,818 $13,380 - - $4,818
-
MMBtu
-
03 2.7135: Install occupancy sensors $165 $415 $165
2,420
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $10,170 $7,950 $10,170
149,568
kWh
- - -
05 2.4235: Remove or close off unneeded compressed air lines $1,884 $4,020 $1,390
20,436
kWh
$494
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,683 $8,662 $1,938
28,501
kWh
$955
-
kW-mo/yr
- $2,790
TOTAL RECOMMENDED $24,362 $37,639 $15,305
225,068
kWh
$1,449
-
kW-mo/yr
$4,818
-
MMBtu
$2,790
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs