| Assessment Year | 2025 |
|---|---|
| Principal Product | Air filters |
| NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
| SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
| Sales Range | $50 M to 100M |
| # of Employees | 162 |
| Plant Area |
56,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $201,811 | 2,964,806 |
kWh
|
$0.068 | |
| Electricity Demand | $105,610 | 6,207 |
kW-mo/yr
|
$17.01 | |
| Natural Gas | $21,187 | 1,935 |
MMBtu
|
$10.95 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,786 | 526 |
Tgal
|
$5.30 | |
| Water Disposal | $1,944 | 526 |
Tgal
|
$3.70 | |
| TOTAL YEARLY COSTS | $333,338 | ||||
| RECOMMENDED SAVINGS* | $24,362 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,642 | $3,212 |
$1,642
24,143
kWh
|
- | - | - | |
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $4,818 | $13,380 | - | - |
$4,818
-
MMBtu
|
- | |
| 03 | 2.7135: Install occupancy sensors | $165 | $415 |
$165
2,420
kWh
|
- | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $10,170 | $7,950 |
$10,170
149,568
kWh
|
- | - | - | |
| 05 | 2.4235: Remove or close off unneeded compressed air lines | $1,884 | $4,020 |
$1,390
20,436
kWh
|
$494
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,683 | $8,662 |
$1,938
28,501
kWh
|
$955
-
kW-mo/yr
|
- | $2,790 | |
| TOTAL RECOMMENDED | $24,362 | $37,639 |
$15,305
225,068
kWh
|
$1,449
-
kW-mo/yr
|
$4,818
-
MMBtu
|
$2,790 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs