Assessment Year | 2022 |
---|---|
Principal Product | Sliced Bacon |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | greater than $500 M |
# of Employees | 225 |
Plant Area |
110,000
ft2
|
Annual Production | 120,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $313,279 | 9,394,238 |
kWh
|
$0.033 | |
Electricity Demand | $192,285 | 16,328 |
kW-mo/yr
|
$11.78 | |
Electricity Fees | $2,955 | - |
|
- | |
Natural Gas | $161,842 | 32,648 |
MMBtu
|
$4.96 | |
Waste Disposal Costs | |||||
Water Usage | $54,116 | 23,010 |
Tgal
|
$2.35 | |
Water Disposal | $175,799 | 20,836 |
Tgal
|
$8.44 | |
TOTAL YEARLY COSTS | $900,276 | ||||
RECOMMENDED SAVINGS* | $83,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $83,244 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.3123: Use decanting, flotation to remove contaminants | $79,442 | $292,000 | - | - | - | $79,442 | |
02 | 2.2511: Insulate bare equipment | $1,251 | $1,729 |
$1,251
37,909
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,248 | $2,875 |
$1,248
37,829
kWh
|
- | - | - | |
04 | 3.7193: Use high pressure wash systems | $768 | $240 | - |
$298
-
MMBtu
|
$207
-
Tgal
|
$263 | |
05 | 2.8114: Change rate schedules or other changes in utility service | $331 | $90 | - | - | - | $331 | |
06 | 2.2511: Insulate bare equipment | $204 | $130 | - |
$204
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $83,244 | $297,064 |
$2,499
75,738
kWh
|
$502
-
MMBtu
|
$207
-
Tgal
|
$80,036 | ||
TOTAL IMPLEMENTED | $83,244 | $297,064 |
$2,499
75,738
kWh
|
$502
-
MMBtu
|
$207
-
Tgal
|
$80,036 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs