Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Combustion Equipment
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 358,206
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 2,730
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,168 2,740,621
kWh
Electricity Demand $55,210 10,500
kW-mo/yr
Electricity Fees $107,025 -
Natural Gas $173,568 56,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $1,900 $3,198 $610
123,681
kWh
$1,290
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,251 $28,450 $2,668
89,977
kWh
$6,583
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $1,692 $1,000 $1,692
57,151
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,159 $450 $372
12,603
kWh
$787
-
kW-mo/yr
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $36,636 $22,800 - - $36,636
-
MMBtu
- -
06 2.1116: Improve combustion control capability $1,053 $3,460 - - $1,053
-
MMBtu
- -
07 3.4111: Use closed cycle process to minimize waste water production $5,708 $3,100 - - - $5,708
-
Tgal
-
08 3.4111: Use closed cycle process to minimize waste water production $5,616 - - - - $5,616
-
Tgal
-
09 4.321: Optimize production lot sizes and inventories $20,210 - - - - - $20,210
TOTAL RECOMMENDED $83,225 $62,458 $5,342
283,412
kWh
$8,660
-
kW-mo/yr
$37,689
-
MMBtu
$11,324
-
Tgal
$20,210
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs