| Assessment Year | 1997 |
|---|---|
| Principal Product | Combustion Equipment |
| NAICS |
n/a
|
| SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
| Sales Range | $10 M to 50M |
| # of Employees | 167 |
| Plant Area |
358,206
ft2
|
| Annual Production | 6,500,000
lb
|
| Production Hrs. Annual | 2,730
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $79,168 | 2,740,621 |
kWh
|
$0.029 |
| Electricity Demand | $55,210 | 10,500 |
kW-mo/yr
|
$5.26 |
| Electricity Fees | $107,025 | - |
|
- |
| Natural Gas | $173,568 | 56,923 |
MMBtu
|
$3.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $83,225 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,900 | $3,198 |
$610
123,681
kWh
|
$1,290
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,251 | $28,450 |
$2,668
89,977
kWh
|
$6,583
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $1,692 | $1,000 |
$1,692
57,151
kWh
|
- | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,159 | $450 |
$372
12,603
kWh
|
$787
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $36,636 | $22,800 | - | - |
$36,636
-
MMBtu
|
- | - | |
| 06 | 2.1116: Improve combustion control capability | $1,053 | $3,460 | - | - |
$1,053
-
MMBtu
|
- | - | |
| 07 | 3.4111: Use closed cycle process to minimize waste water production | $5,708 | $3,100 | - | - | - |
$5,708
-
Tgal
|
- | |
| 08 | 3.4111: Use closed cycle process to minimize waste water production | $5,616 | - | - | - | - |
$5,616
-
Tgal
|
- | |
| 09 | 4.321: Optimize production lot sizes and inventories | $20,210 | - | - | - | - | - | $20,210 | |
| TOTAL RECOMMENDED | $83,225 | $62,458 |
$5,342
283,412
kWh
|
$8,660
-
kW-mo/yr
|
$37,689
-
MMBtu
|
$11,324
-
Tgal
|
$20,210 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs