ITAC Assessment: UF0064
ITAC logo
ITAC Assessment: UF0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product commercial printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 22,000
ft2
Annual Production 29,520,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,281 639,508
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,657 $10,991 $3,657
48,066
kWh
02 2.7135: Install occupancy sensors $225 $192 $225
2,931
kWh
03 2.4133: Use most efficient type of electric motors $245 $373 $245
3,224
kWh
04 2.7232: Replace existing hvac unit with high efficiency model $820 - $820
10,844
kWh
05 2.7212: Install or upgrade insulation on hvac distribution systems $8,144 $37,533 $8,144
107,268
kWh
TOTAL RECOMMENDED $13,091 $49,089 $13,091
172,333
kWh
TOTAL IMPLEMENTED $12,866 $48,897 $12,866
169,402
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs