ITAC Assessment: MS0006
ITAC logo
ITAC Assessment: MS0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Sweetened Condensed Milk
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $50
M
to 100
M
# of Employees 37
Plant Area
n/a
Annual Production 2,812,500
Tgal
Production Hrs. Annual 2,772
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,773 1,771,981
kWh
Natural Gas $89,409 28,753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2121: Increase amount of condensate returned $3,908 $8,000 - $3,908
-
MMBtu
02 2.3212: Optimize plant power factor $3,266 $3,060 $3,266
-
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $777 - $777
26,084
kWh
-
04 2.2136: Install / repair insulation on steam lines $616 $1,500 - $616
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $410 $175 $410
5,569
kWh
-
06 2.7134: Use photocell controls $122 $60 $122
4,103
kWh
-
TOTAL RECOMMENDED $9,099 $12,795 $4,575
35,756
kWh
$4,524
-
MMBtu
TOTAL IMPLEMENTED $1,187 $175 $1,187
31,653
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs