Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Mechanical power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0845 #07 Y:2022 Turn off equipment during breaks, reduce operating time $3,762 $505
MA0845 #06 Y:2022 Insulate bare equipment $6,066 $2,910
MA0845 #05 Y:2022 Adjust vents to minimize energy use $8,349 $10,667
MA0845 #04 Y:2022 Turn off equipment during breaks, reduce operating time $10,754 $14,292
MA0845 #03 Y:2022 Replace electrically-operated equipment with fossil fuel equipment $13,709 $182,139
MA0845 #02 Y:2022 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $26,668 $60,000
MA0845 #01 Y:2022 Use solar heat to make electricty $108,785 $906,122
IC0265 #04 Y:2022 Eliminate combustible gas in flue gas $19,650 $2,435
IC0265 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,312 $7,533
IC0265 #02 Y:2022 Use insulation in furnaces to facilitate heating / cooling $705 $304
IC0265 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $11,567 $5,100
OK1073 #05 Y:2022 Reduce space conditioning during non-working hours $1,129 -
OK1073 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,707 $1,176
OK1073 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $15,161 $9,927
OK1073 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $10,548 $12,334
OK1073 #01 Y:2022 Optimize plant power factor $32,771 $39,489
LE0486 #07 Y:2019 Utilize higher efficiency lamps and/or ballasts $6,558 $28,275
LE0486 #06 Y:2019 Utilize energy-efficient belts and other improved mechanisms $3,726 $7,400
LE0486 #05 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $35,256 $65,000
LE0486 #04 Y:2019 Use properly designed and sized hvac equipment $15,202 $21,000