Assessment Year | 2019 |
---|---|
Principal Product | Power Transmission Components |
NAICS | 333613: Mechanical Power Transmission Equipment Manufacturing |
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 50 |
Plant Area |
450,000
ft2
|
Annual Production | 11,000
units
|
Production Hrs. Annual | 2,912
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,459,312 | 24,493,080 |
kWh
|
$0.060 |
Electricity Demand | $318,464 | 44,831 |
kW-mo/yr
|
$7.10 |
Electricity Fees | $30,314 | - |
|
- |
Natural Gas | $339,106 | 61,973 |
MMBtu
|
$5.47 |
TOTAL YEARLY COSTS | $2,147,196 | |||
RECOMMENDED SAVINGS* | $127,704 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,496 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $57,024 | $500 |
$57,024
950,404
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $8,764 | $720 |
$8,764
146,400
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,174 | $1,540 |
$1,010
16,831
kWh
|
$164
-
kW-mo/yr
|
- | |
04 | 2.7233: Use properly designed and sized hvac equipment | $15,202 | $21,000 | - | - |
$15,202
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,256 | $65,000 |
$26,612
460,204
kWh
|
$8,644
-
kW-mo/yr
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,726 | $7,400 |
$3,726
62,103
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,558 | $28,275 |
$5,273
88,884
kWh
|
$1,285
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $127,704 | $124,435 |
$102,409
1,724,826
kWh
|
$10,093
-
kW-mo/yr
|
$15,202
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,496 | $30,535 |
$15,047
252,115
kWh
|
$1,449
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs