ITAC Assessment: IC0265
ITAC logo
ITAC Assessment: IC0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Agricultural Chains
NAICS 333613: Mechanical Power Transmission Equipment Manufacturing
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 360,000
ft2
Annual Production 3,800
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,120 6,434,631
kWh
Electricity Demand $104,182 13,160
kW-mo/yr
Natural Gas $155,734 54,210
MMBtu
Waste Disposal Costs
Water Usage $15,174 1,344
Tgal
TOTAL YEARLY COSTS $706,210
RECOMMENDED SAVINGS* $36,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,584

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,567 $5,100 $11,567
172,635
kWh
- -
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $705 $304 - - $705
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,312 $7,533 $4,254
63,493
kWh
$58
-
kW-mo/yr
-
04 2.1115: Eliminate combustible gas in flue gas $19,650 $2,435 - - $19,650
-
MMBtu
TOTAL RECOMMENDED $36,234 $15,372 $15,821
236,128
kWh
$58
-
kW-mo/yr
$20,355
-
MMBtu
TOTAL IMPLEMENTED $16,584 $12,937 $15,821
236,128
kWh
$58
-
kW-mo/yr
$705
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs