Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

631

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1073 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $10,548 $12,334
OK1073 #01 Y:2022 Optimize plant power factor $32,771 $39,489
OK1070 #08 Y:2022 Replace fossil fuel equipment with electrical equipment $2,533 $440
OK1070 #07 Y:2022 Utilize higher efficiency lamps and/or ballasts $6,761 $4,884
OK1070 #06 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $2,927 $3,985
OK1070 #05 Y:2022 Upgrade controls on compressors $2,659 $8,954
OK1070 #04 Y:2022 Recover heat from exhausted steam, hot air or hot water $3,689 $3,294
OK1070 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $4,014 $990
OK1070 #02 Y:2022 Reduce the pressure of compressed air to the minimum required $1,329 -
OK1070 #01 Y:2022 Optimize plant power factor $2,809 $9,600
IC0245 #05 Y:2020 Upgrade controls on compressors $23,890 $13,698
IC0245 #04 Y:2020 Check for accuracy of utility / power meters $4,231 -
IC0245 #03 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $951 $801
IC0245 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $6,465 $4,250
IC0245 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $575 $517
MZ0300 #07 Y:2020 Meter recycled water (to reduce sewer charges) $11,578 $3,168
MZ0300 #06 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $2,784 $200
MZ0300 #05 Y:2020 Eliminate or reduce compressed air usage $5,678 $3,310
MZ0300 #04 Y:2020 Reduce the pressure of compressed air to the minimum required $5,728 $4,770
MZ0300 #03 Y:2020 Install vinyl strip / high speed / air curtain doors $1,074 $5,200