| Assessment Year | 2020 |
|---|---|
| Principal Product | Remanufactured engines and components |
| NAICS | 333618: Other Engine Equipment Manufacturing |
| SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
255,000
ft2
|
| Annual Production | 35,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $370,135 | 4,347,210 |
kWh
|
$0.085 | |
| Natural Gas | $79,987 | 14,820 |
MMBtu
|
$5.40 | |
| Waste Disposal Costs | |||||
| Water Usage | $11,611 | 2,661 |
Tgal
|
$4.36 | |
| Water Disposal | $23,152 | 2,661 |
Tgal
|
$8.70 | |
| TOTAL YEARLY COSTS | $484,885 | ||||
| RECOMMENDED SAVINGS* | $30,223 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $5,382 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,598 | $1,650 |
$1,977
23,253
kWh
|
- | $621 | |
| 02 | 2.7135: Install occupancy sensors | $783 | $460 |
$783
9,216
kWh
|
- | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,074 | $5,200 |
$1,074
12,635
kWh
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,728 | $4,770 |
$5,728
67,390
kWh
|
- | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $5,678 | $3,310 |
$5,678
66,791
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,784 | $200 |
$2,784
32,755
kWh
|
- | - | |
| 07 | 3.4116: Meter recycled water (to reduce sewer charges) | $11,578 | $3,168 | - |
$11,578
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $30,223 | $18,758 |
$18,024
212,040
kWh
|
$11,578
-
Tgal
|
$621 | ||
| TOTAL IMPLEMENTED | $5,382 | $1,850 |
$4,761
56,008
kWh
|
- | $621 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs