ITAC Assessment: OK1070
ITAC logo
ITAC Assessment: OK1070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Gas turbines
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 110,000
ft2
Annual Production 2,500
units
Production Hrs. Annual 6,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,866 4,047,774
kWh
Natural Gas $10,874 2,025
MMBtu
LPG $8,465 215
MMBtu
Waste Disposal Costs
Water Usage $2,742 459
Tgal
Water Disposal $1,560 324
Tgal
TOTAL YEARLY COSTS $266,507
RECOMMENDED SAVINGS* $26,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $2,809 $9,600 - $2,809 - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,329 - $1,329
22,156
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,014 $990 $4,014
66,903
kWh
- - -
04 2.2449: Recover heat from exhausted steam, hot air or hot water $3,689 $3,294 - - $3,689
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $2,659 $8,954 $2,659
44,312
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,927 $3,985 $2,927
48,788
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,761 $4,884 $6,761
112,684
kWh
- - -
08 2.1321: Replace fossil fuel equipment with electrical equipment $2,533 $440 - - - $2,533
TOTAL RECOMMENDED $26,721 $32,147 $17,690
294,843
kWh
$2,809 $3,689
-
MMBtu
$2,533
TOTAL IMPLEMENTED $8,002 $9,944 $8,002
133,371
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs