Assessment Year | 2022 |
---|---|
Principal Product | Gas turbines |
NAICS | 333611: Turbine and Turbine Generator Set Units Manufacturing |
SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
110,000
ft2
|
Annual Production | 2,500
units
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $242,866 | 4,047,774 |
kWh
|
$0.060 | |
Natural Gas | $10,874 | 2,025 |
MMBtu
|
$5.37 | |
LPG | $8,465 | 215 |
MMBtu
|
$39.37 | |
Waste Disposal Costs | |||||
Water Usage | $2,742 | 459 |
Tgal
|
$5.97 | |
Water Disposal | $1,560 | 324 |
Tgal
|
$4.81 | |
TOTAL YEARLY COSTS | $266,507 | ||||
RECOMMENDED SAVINGS* | $26,721 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $8,002 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $2,809 | $9,600 | - | $2,809 | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,329 | - |
$1,329
22,156
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,014 | $990 |
$4,014
66,903
kWh
|
- | - | - | |
04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $3,689 | $3,294 | - | - |
$3,689
-
MMBtu
|
- | |
05 | 2.4224: Upgrade controls on compressors | $2,659 | $8,954 |
$2,659
44,312
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,927 | $3,985 |
$2,927
48,788
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,761 | $4,884 |
$6,761
112,684
kWh
|
- | - | - | |
08 | 2.1321: Replace fossil fuel equipment with electrical equipment | $2,533 | $440 | - | - | - | $2,533 | |
TOTAL RECOMMENDED | $26,721 | $32,147 |
$17,690
294,843
kWh
|
$2,809 |
$3,689
-
MMBtu
|
$2,533 | ||
TOTAL IMPLEMENTED | $8,002 | $9,944 |
$8,002
133,371
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs