Assessment Year | 2024 |
---|---|
Principal Product | Fabricated Metal Parts |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
78,000
ft2
|
Annual Production | 100,220
pieces
|
Production Hrs. Annual | 8,008
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $163,959 | 2,411,040 |
kWh
|
$0.068 | |
Electricity Demand | $65,994 | 5,184 |
kW-mo/yr
|
$12.73 | |
Electricity Fees | $38,135 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $2,381 | 405 |
Tgal
|
$5.88 | |
Water Disposal | $3,548 | 405 |
Tgal
|
$8.76 | |
TOTAL YEARLY COSTS | $274,017 | ||||
RECOMMENDED SAVINGS* | $648,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4321: Upgrade obsolete equipment | $636,028 | $600,000 |
$(-6,920.0)
(-101,764)
kWh
|
$7,180
-
kW-mo/yr
|
- | $635,768 | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $5,522 | $700 |
$4,687
68,929
kWh
|
$1,315
-
kW-mo/yr
|
$(-480.0) | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $2,651 | $7,497 |
$2,065
30,347
kWh
|
$586
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,899 | $1,980 |
$1,511
22,216
kWh
|
$388
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,840 | $3,750 |
$1,458
21,840
kWh
|
$382
-
kW-mo/yr
|
- | - | |
06 | 2.7442: Keep doors and windows shut when not on use | $792 | $320 |
$160
2,359
kWh
|
$632
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $648,732 | $614,247 |
$2,961
43,927
kWh
|
$10,483
-
kW-mo/yr
|
$(-480.0) | $635,768 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs